• español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   DSpace Home
  • Producción Científica
  • Facultad de Ingeniería. ATENA: Aplicaciones en Termofluidos, Energía y Nanomateriales Avanzados
  • Artículos
  • View Item
  •   DSpace Home
  • Producción Científica
  • Facultad de Ingeniería. ATENA: Aplicaciones en Termofluidos, Energía y Nanomateriales Avanzados
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Análisis termoeconómico del potencial de generación de electricidad mediante la integración de un ciclo Rankine con la incineración de residuos sólidos urbanos

Thumbnail
View/Open
Análisis termoeconómico del potencial de generación de electricidad mediante la integración de un ciclo Rankine con la incineración de residuos sólidos urbanos..pdf (1.642Mb)
Date
2022-10-08
Author
Sánchez Ascanio, Lisneider
Torres Correa, Karen Andrea
Quintero Coronel, Daniel Andrés
Metadata
Show full item record
Abstract
Municipal Solid Wastes generated by human activities increase as the population grows; in Ocaña city, Norte de Santander, Colombia, these wastes reach a monthly production of about 2660 tons, made up of 65.6% waste food, 15.3% plastics, 9.9% toilet paper, 3.6% paperboard, 2.6% textile residues, 1.6% paper, 0.8% wood wastes, and 0.1% rubber. This work estimates the energy potential from municipal solid wastes for electricity generation and their production costs. A multicriteria decision analysis allowed selecting the best technology for the wastes processing based on their energy content. For the evaluated criteria, the incineration process showed priority. A model developed in the engineering equation solver software allowed calculating the electrical energy potential by integrating the incineration process with a Rankine cycle. By implementing a thermo-economic assessment, the electricity generation costs were determined, where the inversion, installation, operation, and maintenance costs were considered. 1974 KW of electrical power with generation costs of $300/KWh and a payback period of 2.5 years show the feasibility of this process
URI
https://repositorioinstitucional.ufpso.edu.co/xmlui/handle/20.500.14167/6075
Collections
  • Artículos [13]

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage Statistics
Implementado por: DIVISIÓN DE SISTEMAS
DSpace software copyright © 2002-2023  DuraSpace
Contact Us | Send Feedback