dc.contributor.advisor | Mejía Rizo, Sabier Alberto | en_US |
dc.contributor.author | Carreño Sánchez, Rafael Hernando | |
dc.date.accessioned | 2022-09-15T14:38:09Z | |
dc.date.available | 2022-09-15T14:38:09Z | |
dc.date.issued | 2017-03-06 | |
dc.identifier.uri | https://repositorioinstitucional.ufpso.edu.co/xmlui/handle/123456789/846 | |
dc.description.abstract | En el siguiente trabajo se detalla el apoyo técnico realizado a la “construcción de un muro de contención en concreto reforzado para la protección de la vía paralela al rio chiquito y reparación del canal abierto, en el sector de Bruselas Ocaña, Norte de Santander” como estudiante-pasante de la Secretaria de Vías, Infraestructura y Vivienda de la alcaldía municipal de Ocaña, donde se describen los objetivos planteados en la etapa inicial y los procesos técnicos que se tuvieron en cuenta para su cumplimiento. | en_US |
dc.language.iso | spa | en_US |
dc.subject | Calidad, tiempo, costos, construcción, concreto reforzado, muro de contención, vía, canal abierto | en_US |
dc.title | Apoyo en el seguimiento técnico a las obras civiles para proponer estrategias que mejoren calidad, tiempo y costos de la secretaria de vías, infraestructura y vivienda de la alcaldía municipal de Ocaña | en_US |
dc.title.translated | Support in the technical monitoring of civil works to propose strategies that improve quality, time and costs of the secretariat of roads, infrastructure and housing of the municipal government of Ocaña | en_US |
dc.description.abstractenglish | The following work details the technical support provided to the "construction of a retaining wall in reinforced concrete for the protection of the road parallel to the Chiquito River and repair of the open channel, in the sector of Brussels Ocaña, Norte de Santander" as student-intern of the Secretary of Roads, Infrastructure and Housing of the municipal government of Ocaña, where the objectives set in the initial stage and the technical processes that were taken into account for their fulfillment are described. | en_US |
dc.subject.keywords | Quality, time, costs, construction, reinforced concrete, retaining wall, road, open channel | en_US |
dc.publisher.faculty | Facultad ingenierías | en_US |
dc.publisher.program | Pregrado ingenieria civil | en_US |
dc.description.degreelevel | Pregrado | en_US |
dc.degree.name | Ingeniero civil | en_US |
dc.contributor.jury | Guerrero Sepúlveda, Luis Elías | |
dc.contributor.jury | Guevara Galvis, Rocío Alexandra | |