Mostrar el registro sencillo del ítem
Seguimiento, evaluación y cumplimiento del plan de contingencia para el transporte de hidrocarburos en Norte de Santander
| dc.contributor.advisor | Armesto Arenas, Alexander | en_US |
| dc.contributor.author | Martínez Duran, Liney | |
| dc.date.accessioned | 2025-03-25T16:03:08Z | |
| dc.date.available | 2025-03-25T16:03:08Z | |
| dc.date.issued | 2023-02-21 | |
| dc.identifier.uri | https://repositorioinstitucional.ufpso.edu.co/xmlui/handle/20.500.14167/5015 | |
| dc.description.abstract | El presente documento corresponde al proyecto final realizado bajo la modalidad de pasantías como trabajo de grado, ejecutado en la Empresa Transportadores de Norte de Santander. En el cuerpo del trabajo, inicialmente se considera el seguimiento y evaluación del cumplimiento de todas las medidas acordadas en el plan de contingencia de la empresa, a través de la resolución 1209 de 2018, con el fin de verificar si se llevaba a cabo el cumplimiento de los factores mismos, observado sus fortalezas y debilidades dentro del Plan de Contingencia. Por lo anterior, se llevó un seguimiento evaluativo a través de listas de chequeos y visitas a campo; así mismo, diferentes actividades tales como: la revisión del PDC; la realización de simulacros por derrames de hidrocarburos; visitas a SOS contingencia; capacitación operativa a los conductores; seguimiento de ruta de los vehículos desde la salida de planta hasta el punto de descargue. | en_US |
| dc.language.iso | spa | en_US |
| dc.subject | Seguimiento; evaluación; cumplimiento; contingencia; hidrocarburos | en_US |
| dc.title | Seguimiento, evaluación y cumplimiento del plan de contingencia para el transporte de hidrocarburos en Norte de Santander | en_US |
| dc.title.translated | Monitoring, evaluation, and compliance with the contingency plan for hydrocarbon transportation in Norte de Santander | en_US |
| dc.contributor.googlescholar | https://scholar.google.com/citations?view_op=list_works&hl=en&user=gDWHksIAAAAJ | en_US |
| dc.contributor.orcid | https://orcid.org/0000-0002-6567-1812 | en_US |
| dc.description.abstractenglish | This document corresponds to the final project carried out under the internship modality as a thesis, at the Transportadores de Norte de Santander Company. The body of the project initially considers the monitoring and evaluation of compliance with all the measures agreed upon in the company's contingency plan, as established by Resolution 1209 of 2018, in order to verify compliance with the factors themselves, observing their strengths and weaknesses within the Contingency Plan. Therefore, an evaluative follow-up was carried out through checklists and field visits. Various activities were also carried out, such as: review of the PDC; hydrocarbon spill drills; visits to SOS contingency centers; operational training for drivers; and monitoring of vehicle routes from the plant's exit to the unloading point. | en_US |
| dc.subject.keywords | Monitoring; evaluation; compliance; contingency; hydrocarbons | en_US |
| dc.identifier.instname | Universidad Francisco de Paula Santander Ocaña | en_US |
| dc.publisher.faculty | Facultad ciencias agrarias y del ambiente | en_US |
| dc.publisher.program | Pregrado ingeniería ambiental | en_US |
| dc.type.local | Pasantía | en_US |
| dc.description.degreelevel | Pregrado | en_US |
| dc.degree.name | Ingeniero ambiental | en_US |
| dc.contributor.jury | Angarita Carrascal, Lina Paola | |
| dc.contributor.jury | Angarita Castilla, Wilson |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Pasantía [371]




